top of page
Quality Control Site Visits
In line with the Passivhaus and AECB certification requirements, our consultants visit the construction site to ensure that the build process is consistent with the detailed design. This involves examining and documenting the following areas of the build process:
Airtightness application
Thermal envelope
Air leakage testing
Window and door installation
Ventilation ducting and routing
bottom of page